BOTTOM
 11/13/10 Plans by Tom Gilmer. |
 Printing the plan on the 3 foot plotter. |
 1:20th scale plan. |
 Station patterns in 1:20 scale. |
 11/19 Forms on building board. |
 9/17/11 Keel cut and fitted. |
 10/8 Table saw rigged for ripping planks. |
 ripping a plank. |
 |
 planks! |
 10/8 Starboard garboard going on. |
 10/10 A few more strakes. |
 10/15 |
 10/21 |
 |
 10/22 Sheer strake. |
 Planking from the sheer down connects with the transom. |
 |
 10/23 Scribed the waterline and planking continues. |
 |
 10/27
Pulled almost all the pins, knocked off some bumps and ridges with the plane, and sanded a bit. |
 10/29 |
 10/30 |
 |
 10/31 |
 |
 11/1 Final plank. |
 11/3 Pulling out form #10. |
 11/4 Some more putty (note can in background). |
 All sanded. |
 Transome trimmed down to where it should be. |
 11/5 Fully taped |
 11/6 Made a stand |
 11/11 3oz cloth laid on. |
 11/12 Glassed. |
 11/13 Unglassed. |
 Forms pulled out. |
 11/20: Resin inside. |
 12/25: Port side glassed. |
 12/27: Starboard side glassed. |
 12/30: Transom glassed. |
 1/18: Deck clamps installed and main beams fitted. |
 1/19: First float in the tub. |
. |
. |